Snyder’s-Lance Boosts DC Productivity,
Reduces Costs By Optimizing Workforce Performance

snyderslancelogo.jpg

Fast-growing Snyder’s-Lance needed to improve productivity to keep operations in line with demand, and chose TZA to assist them in optimizing labor performance and maximizing the capacity of every square inch of their distribution center. By implementing TZA's Labor Management Program with ProTrack Software, and completing a facility redesign, Snyder’s-Lance achieved $595,000 in annual labor savings while shipping 950,000 more cases than the previous year. Labor cost per case was reduced by 47%.